Survey Manager on 245km Mining Access Road for Ashanti Gold 350km east of Kalgoorlie, Western Australia. Road clearing and formation with culvert installation, radio tower base works and bridge construction.
Survey work for Dempsey Wood Ltd carrying out construction setout and asbuilt works. Intersection works included service relocation, bridge and retaining wall construction and new kerb and pavement works.
Construction setout for $1.8m large diameter trunk sewer replacement for March Cato Ltd. Manhole depths up to 8m deep constructed by open cut and directional drilling.
Investigation work for Watercare water and wastewater services. Identification and location of manholes and pump station chambers throughout the Auckland area to update GIS records and provide information for design.
Open cut and directionally drilled Trunk Sewer main in built up urban area for Kerry Drainage Ltd. Set out of all drill lines with cover checks beneath roads and streams along with design and asbuilt surveys.
Project Manager and Surveyor on $25m commercial development in West Auckland. Roles include day to day management and responsibility for all survey setout and machine control operations.
Survey Manager on 25km section of Solomon Spur railway extension for FMG (Fortescue Mining Group), Pilbara, Western Australia. Construction of 25km of railway embankment with 340 culvert crossings.