Established in 2005, Antonio Civil Engineering Ltd has been involved and have had input in the following projects:

1. Tropicana Gold Mine Access Road

Survey Manager on 245km Mining Access Road for Ashanti Gold 350km east of Kalgoorlie, Western Australia. Road clearing and formation with culvert installation, radio tower base works and bridge construction.

2. Wairau Road/Forest Hill Road Intersection

Survey work for Dempsey Wood Ltd carrying out construction setout and asbuilt works. Intersection works included service relocation, bridge and retaining wall construction and new kerb and pavement works.

3. Kerwyn Avenue Trunk Sewer Project, East Tamaki

Construction setout for $1.8m large diameter trunk sewer replacement for March Cato Ltd. Manhole depths up to 8m deep constructed by open cut and directional drilling.

4. Watercare Manhole and Pump Station Design Surveys

Investigation work for Watercare water and wastewater services. Identification and location of manholes and pump station chambers throughout the Auckland area to update GIS records and provide information for design.

5. South Lynn Trunk Sewer

Open cut and directionally drilled Trunk Sewer main in built up urban area for Kerry Drainage Ltd. Set out of all drill lines with cover checks beneath roads and streams along with design and asbuilt surveys.

6. Westgate Town Centre

Project Manager and Surveyor on $25m commercial development in West Auckland. Roles include day to day management and responsibility for all survey setout and machine control operations.

7. Solomon Spur Railway

Survey Manager on 25km section of Solomon Spur railway extension for FMG (Fortescue Mining Group), Pilbara, Western Australia. Construction of 25km of railway embankment with 340 culvert crossings.